Hi Jiri;
I realize that the job scheduling has been moved to the web interface, that is the interface I was referring to.
The manual you have indicated appears to be the same as the one that came with the upgrade, which I was using.
I upgraded NCM on an existing server.
My problem is that there is no column (I have enabled all columns in the list) that indicates the NEXT run time for a job. You also can’t sort on the Status column; the sort selections are under the pulldown on the column, but are greyed-out.
I have four (4) pages of jobs, so being able to identify what is scheduled to run easily would really help.
When I did the upgrade, several jobs (which had been run months prior and the scheduled time would have been in the past) ran and caused a network blip. The old display, on the server, showed when a job was next scheduled to run which made it easy to determine if it was doing what I expected.
Thanks
Terry